PIB Daily Digest

Search PIB intelligence

Jump to dashboards and focused views.

Back to dashboard
Ministry of Railways

Indian Railways Approves ₹272 Crore Bypass Line Between Adra and Joychandipahar to Boost Freight Capacity

PrelimsMainsGS3EconomyGovernment Schemes
Source-grounded summary

The Ministry of Railways has approved a ₹272 crore project to construct an 11 km bypass line between Adra and Joychandipahar in South Eastern Railway. Designed to boost freight capacity, the project provides dedicated path segregation and a bi-directional connection to the upcoming third line, supporting industrial traffic including SAIL and BCCL requirements. The existing network operates at 71% utilization, and the bypass aims to eliminate operational bottlenecks, reduce surface-crossing detentions, improve operational efficiency, and handle an additional traffic of 8.88 MTPA. The line forms part of the identified Energy, Mineral and Cement Corridor.

Notes are generated only from linked official PIB content. Always verify the source.