Ministry of Railways
Second Tunnel Boring Machine Starts to Excavate India’s First Undersea Tunnel beneath Thane Creek in Maharashtra for Mumbai–Ahmedabad Bullet Train Project
MainsGS2GS3Science & Technology
Source-grounded summary
On 18 July 2026 the Ministry of Railways reported that a second Tunnel Boring Machine (TBM) has begun excavating the under‑sea portion of the Mumbai‑Ahmedabad Bullet Train corridor beneath Thane Creek, Maharashtra. The project includes a 10 km stretch, of which 7 km will be undersea, marking India’s first rail undersea tunnel. The TBM, a 13.6 m diameter, 3,200‑tonne Mixshield‑type machine, employs slurry‑based pressurised bentonite to stabilise the face and features real‑time multi‑gas monitoring and extensive safety systems. The launch required a 39‑m deep shaft and integrates advanced segment‑ring building and monitoring technologies to ensure structural integrity and minimise surface settlement.